Data Center & Integrated Supply Center

Customer: Froedtert & Medical College of Wisconsin

Uihlein Electric partnered with Froedtert & Medical College of Wisconsin to deliver a structured cabling solution. This project was designed to support the high demands of their data center and integrated supply center, ensuring a robust and efficient infrastructure.

Project Scope

  • Data Center Cabinets & Racks: Installation of high-quality cabinets and racks to organize and secure equipment efficiently.
  • Conveyance Plan: Implement cable trays, runways, J-hooks, and fiber ducts to enable organized, scalable cabling routes.
  • Optical Fiber System: Deployment of MPO OM4+ fiber optic cables, cassettes, shelves, and backbone cabling for high-speed data transmission.
  • Copper Cabling: Installation of Category 6A cables, patch panels, and patch cords to support reliable network connectivity.
  • Backbone Cabling: Extension of fiber and copper cabling from Demarc to the data center, ensuring seamless integration.
  • Grounding: Grounding the cabinets, trays, and infrastructure to enhance safety and performance.
  • Wireless Access Points: Setting up wireless connectivity through precise installation and configuration.
  • Security System Infrastructure: Cabling for cameras and access controls, used to bolster facility security.

From planning to execution, each detail was designed to enhance performance, scalability, and reliability for Froedtert & Medical College of Wisconsin.

Similar projects

  • Uihlein Electric at Potawatomi Sportsbook Lounge

  • Milwaukee Winter Club Indoor Skate Rink

Crafting the high quality products you can trust, Serving you better since 1995!

Empowering Milwaukee Since 1911
Empowering Milwaukee Since 1911